Âé¶¹´«Ã½Ó³»­

Skip to main content

Alliant Energy – Whispering Willow Wind Farm

Alliant Energy - Whispering Willow Wind Farm - Turbine Installation Blade Lift

Âé¶¹´«Ã½Ó³»­ was the erection subcontractor for the foundations, 21 Vestas V 82, 1.65 MW turbines and towers. As the erection subcontractor to RMT, we provided the labor, project supervision and four cranes needed for tower erection, attaching blades and nacelle and rotor installation.

Âé¶¹´«Ã½Ó³»­ coordinated the daily delivery of the turbines to the site (scheduling, site locations and interfacing with the turbine component trucking company). Âé¶¹´«Ã½Ó³»­ was also responsible for the inspection and off-loading of all turbine components, which included the four turbine tower sections, hub, three blades, nacelle and VPM.

Client

Alliant Energy

Location
Franklin, Iowa
Architect/Engineer

RMT

Âé¶¹´«Ã½Ó³»­ Role
Self-perform Construction
Project Type
New Construction
Project Size
35MW

MARKET
Renewable Energy

Project Highlights

  • Âé¶¹´«Ã½Ó³»­ worked with local road commissioners to coordinate county road usage and road crossings.
  • Âé¶¹´«Ã½Ó³»­ coordinated with the local utility (Franklin County REC) to manage electrical line drops for crane movement between sites.
  • This project was completed within budget and 14 days ahead of schedule.